Laserfiche WebLink
Hugo Training Center (HTC) Site Narrative <br /> In 2012, the Xcel Energy Hugo Training Center building was designed, permitted, and constructed. The <br /> original plans for the site included several future training facility expansions and space to locate a future <br /> service center on the north half of the property. A 2017 project added a Gas Village training area west of <br /> the HTC building. <br /> In 2021, Xcel Energy sought to add outdoor non-energized transmission training lines along the western <br /> boundary of the property to address a need for improved linesman training facilities. A project was <br /> presented to and approved by the City of Hugo, but it was not constructed.After a thorough review of its <br /> training needs,company officials responsible for multiple areas of staff training wished to execute a more <br /> complete vision for the site. Staff were directed to create a full site plan. <br /> With this filing, Xcel Energy is proposing to construct multiple training operations at the HTC. The <br /> company's vision would have the site become the host for most of the company's staff training of gas, <br /> electrical and nuclear operators in their northern territories. The proposed site facilities and co-location <br /> of training staff will create operating efficiencies and provide new opportunities for training collaboration <br /> with other utilities' staff and first responders from throughout the region. <br /> Site History <br /> - 2012 Original Site Plan and Conditional Use Permit <br /> o Training Center was approved by City of Hugo in early 2012 which included three phases <br /> of a site plan for an approximate 50,000 square foot building and outdoor training <br /> facilities: <br /> ■ Main building—classroom, labs, offices, conference room, etc. <br /> ■ Indoor"electric barn" <br /> ■ Indoor transmission training <br /> ■ Outdoor training field: electric distribution pole array <br /> o Outdoor training field: gas Future Service Center:to be constructed on north parcel <br /> - 2017 Revised Site Plan and Conditional Use Permit Amendment <br /> o Gas Village Training Facility: constructed on west side of property <br /> o Site plan included identifying a future building expansion of approximately 12,000 square <br /> feet for substation training. <br /> - 2021 Revised Site Plan, and Conditional Use Permit Amendment and Height Variance Exemption <br /> o Approved by City of Hugo in Spring 2021, with 72-ft maximum structure height. <br /> o Transmission Line Training Facility—outdoor and non-energized <br /> o Project was put on hold by Xcel Energy in Summer/Fall 2021, in favor of a combined <br /> Substation and Transmission Line Training Facility—outdoor and non-energized. <br /> Site Plans- Present and Future <br /> Since this site was first planned, designed and constructed 10 years ago, the Xcel Energy training <br /> department and its needs have evolved. Safety is a core value at Xcel Energy, and the development of <br /> high-quality training facilities for our employees has been prioritized. <br />