Laserfiche WebLink
8. Construc�on materials and methods have been designed to allow for quality results and longer <br />lifespans. This includes pavements with the proper subbase materials and the inclusion of a <br />biofiltra�on basin for collec�ng surface water runoff and mee�ng the needs of the watershed <br />district’s best management prac�ces. The park ameni�es are designed to be long las�ng and <br />therefore require less ongoing maintenance or replacement needs. <br />Taking Care of What We Have <br />1. No, the project is new construc�on. <br />2. Yes, the city will ensure protec�on and full u�liza�on of the proposed facili�es. The City will <br />include the new Bernin development and ameni�es into the exis�ng capital asset management <br />plan. <br />3. Yes, the exis�ng high-quality natural areas and water resources will be preserved. <br />4. Yes, the project restores and reconstructs natural communi�es. The loca�on of previous <br />buildings and some exis�ng debris on site will be removed, cleaned up, and restored <br />appropriately. In areas where new grading or tree removal is necessary, the site will be restored, <br />and new trees will be planted around the parking and picnic areas. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />