My WebLink
|
Help
|
About
|
Sign Out
Home
2024.08.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.08.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2024 3:47:35 PM
Creation date
9/16/2024 3:39:00 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/5/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM July 22, 2024 <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Oneka Fields <br />Final Plat Review <br /> WSB Project No. 025586-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the Final Plat submittal for the Shores of Oneka Lake 4th Addition. We have <br />reviewed the following information related to this application: <br /> <br />• Oneka Fields Final Plat, by Carlson McCain <br />• Oneka Fields Sanitary Sewer, Watermain, Storm Sewer, and Street Construction Plans <br />dated June 7, 2024. <br />• Oneka Fields Hydrology Memo, by Carlson McCain, dated 6/7/2024 <br />• Oneka Fields turning movements for fire truck access, by Carlson McCain, dated <br />06/27/24. <br /> <br />Based on the review of the documents, we offer the following Engineering comments related to <br />this application: <br /> <br />General/Access <br /> <br />1. The subject property is located east of Highway 61 at the intersection of 159th Street and <br />Goodview Avenue, adjacent to the Shores of Oneka Lake development. <br />2. The roundabout at TH 61 and 159th Street will serve as the primary access for the <br />development and is open to traffic as of late last fall. <br />3. 159th Street will be extended from Goodview Avenue to the north plat line. 159th Street will be <br />constructed to a width of 32-ft face of curb to face of curb and include an 8-ft trail along the <br />east side, consistent with the portion of 159th Street already constructed. <br />4. Two access points into the site are proposed with one being located on 159th Street and the <br />other being located on Goodview Avenue. Minor modifications along with signage <br />comments have been requested as part of the plan comment process. <br />5. The retaining wall proposed will be the responsibility of the development without City <br />maintenance responsibilities. <br /> <br />Utility Plan <br /> <br />6. An 8” sanitary sewer will be extended along 159th Street North from an existing sanitary <br />sewer stub extended from the intersection of Goodview Avenue North and 159th Street. An 8” <br />sanitary sewer will also be extended from the stub previously extended from Goodview <br />Avenue into and throughout the Oneka Fields site to provide service to the five buildings. <br />7. The construction plans correctly show an 8” watermain being extended along 159th Street. <br />Watermain is also looped through Oneka Fields from Goodview Avenue to the watermain <br />constructed within 159th Street. <br />8. The sanitary sewer will be connecting into an 8” sanitary sewer stub provided in a previous <br />phase of this development.
The URL can be used to link to this page
Your browser does not support the video tag.