My WebLink
|
Help
|
About
|
Sign Out
Home
2024.11.04 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.11.04 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 4:24:21 PM
Creation date
1/2/2025 4:13:14 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/4/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feasibility Report <br />2025 Duck Pass, Palmes Long Lake Estates, and Ingersoll Avenue N Area Street Improvement Project <br />City of Hugo <br />WSB Project No. 026750-000 Page 2 <br />2. Introduction <br />2.1 Authorization <br />On September 16, 2024, the Hugo City Council authorized the preparation of a <br />feasibility report for the 2025 Duck Pass, Palmes Long Lake Estates, and Ingersoll <br />Avenue N Area Street Improvement Project. <br />2.2 Scope <br />This feasibility report includes roadway reclamation and overlay and limited drainage <br />improvements along the following existing roads: <br />x Duck Pass <br />o 136th Street from Isleton Avenue N to the west cul-de-sac <br />o 136th Street Circle North from 136th Street N to the south cul-de-sac <br />o 136th Street Court N from 136th Street N to the south cul-de-sac <br />x Palmes Lakes Estates <br />o Janero Avenue N from 122nd Street N to 125th Street Court N <br />o 125th Street Court N from Janero Avenue to the west cul-de-sac <br />o 125th Street N from 125th Street Court N to 125th Street Circle N <br />o 125th Street Circle N from 125th Street N to the north cul-de-sac <br />x Ingersoll Avenue N from 122 <br />nd Street N to noprth cul-de-sac <br />2.3 Data Available <br />Information and materials used in the preparation of this report include the following: <br />x City of Hugo 5-Year Capital Improvement Plan, approved in 2024 <br />x City of Hugo Assessment Policy Manual <br />x City of Hugo Property Index Records <br />x City of Hugo Record Drawings <br />x Topographic Survey <br />x Field Observations of the Project Area <br />x Pavement Investigation Report completed by WSB, dated October 2024 <br />2.4 Project History <br />The 2025 Duck Pass, Palmes Long Lake Estates, and Ingersoll Avenue N Area Street <br />Improvement Project is identified in the City’s Capital Improvement Plan (CIP) to <br />address the deteriorating condition of the roadway. The CIP provides a schedule for <br />the various roadway improvements that are necessary to maintain the City streets in <br />an effective and efficient manner.
The URL can be used to link to this page
Your browser does not support the video tag.