My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 07.25.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 07.25.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 11:44:43 AM
Creation date
3/6/2025 11:40:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 5 <br /> <br />being located on 159th Street and the other being located on Goodview Avenue. Minor <br />modifications along with signage comments have been requested as part of the plan comment <br />process. <br /> <br />Parking <br /> <br />The City Code requires two spaces per unit plus one stall per five units. The site plan shows <br />single stall garages for each unit. The applicant has indicated that one parking stall per unit <br />would be provided in the garage and a second in the driveway. Driveways are required to be a <br />minimum of 22 feet long and must be dimensioned on the plans. Additionally, 24 guest parking <br />stalls are provided where 12 are required. This meets the ordinance requirements for number of <br />units. <br /> <br />No parking will be allowed on the private drives and the apartment contracts should include <br />language to this effect. As noted in the Multi-Family Development Design Guidelines, garages <br />should remain open for vehicle parking and the contracts should address that as well. <br /> <br />Sidewalks and Trails <br /> <br />The trail along 159th Street will be extended to the north with the development. Staff <br />recommends the developer evaluate whether internal sidewalks should be provided for the <br />development. <br /> <br />Grading, Drainage, and Water Re-use <br /> <br />As part of the Shores of Oneka Lake development, the planned stormwater management for this <br />site was accommodated already in the development. We have confirmed the assumptions for the <br />site at the time of initial design are in accordance with current plans. In fact, the site contains <br />less impervious coverage than previously anticipated. The site is meeting water quality <br />requirements primarily through water reuse for onsite irrigation. The applicant will need to <br />submit the water reuse plans for the development for review. <br /> <br />The retaining wall proposed will be the responsibility of the development without City <br />maintenance responsibilities. <br /> <br />Utilities <br /> <br />The sanitary sewer and watermain will be connected to stubs provided in a previous phase of this <br />development. The construction plans correctly show a watermain being extended along 159th <br />Street. Watermain is also looped through the development from Goodview Avenue to the <br />watermain constructed within 159th Street. <br /> <br />Wetlands <br /> <br />There are no wetland on the property.
The URL can be used to link to this page
Your browser does not support the video tag.