My WebLink
|
Help
|
About
|
Sign Out
Home
2025.03.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.03.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:13:46 PM
Creation date
3/18/2025 1:09:06 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capstone Homes (Munger Property) – Sketch Plan <br />criteria. Staff will continue to work with the developer on their proposal to request a change in the <br />zoning to Planned Unit Development as the project moves forward. <br />Because its proximity to the ditch, the property is in the Shoreland Overlay district. The <br />development will need to meet all of the MN DNR shoreland standards as they relate to PUD <br />approvals. It is unclear whether this has been evaluated with the development layout. <br />Housing Types/Design <br />The developer is proposing 90 single family lots at 50 feet wide. The applicant has provided <br />building elevations. All homes will be built on slab on grade foundations. The proposed home <br />designs seem to provide a variety of architectural styles and are included in the packet. <br />Streets & Access <br />The developer is showing access to the site from the development to the south and 165th Street. <br />165th Street is a rural section gravel roadway that is approximately 24 feet in width, except for the <br />first 400 feet of 165th Street immediately west of Highway 61. This portion of Highway 61 has <br />bituminous surfacing. <br />The 2040 Comprehensive Plan identifies 165th Street as an urban section minor collector road <br />from Elmcrest Avenue to Highway 61 with a future trail making connection to the Hardwood <br />Creek Regional Trail. The change in design is due to the changes in future traffic patterns and <br />increase in population an employment in the area. The change in design is not only related to <br />development directly adjacent to the road, but what is planned for traffic patterns in the future <br />with regional development. <br />For the development to move forward improvements to 165th Street are required to ensure there <br />are adequate public facilities to serve the development. Based on the 2040 Comprehensive Plan <br />the developer would be required to construct an urban section (curb, gutter, trail) minor collector <br />road from the west property line of the development to Highway 61. Staff has discussed some <br />interim improvements to the 165th Street as well. <br />Below are the options based on past policies: <br />1. The developer could construct the urban section minor collector road from the west <br />property line of the development to Highway 61. <br />2.The developer could construct a rural section minor collector road from the west property <br />line of the development to Highway 61, as an interim improvement. They would then be <br />required to pay the cost to construct ½ of the urban section minor collector along their <br />frontage and be credited for the amount to construct the rural section road. <br />3. The City Council did include paving all of 165th Street to a rural section road to its <br />Capital Improvement Program (CIP) slated for 2026, as interim improvement. If the road <br />is paved, as development occurs along 165th Street the developer would be required to <br />pay the cost ½ of the urban section minor collector along the development lineal frontage. <br />During 2025 goal setting processes, the Planning Commission and City Council discussed this <br />topic of 165th Street improvements. They included in their goals for 2025 to prepare and
The URL can be used to link to this page
Your browser does not support the video tag.