Laserfiche WebLink
Capstone Homes (Munger Property) – Sketch Plan <br />complete a study along 165th Street. The study is proposed to include ultimate road design, <br />construction costs, environmental analysis, evaluation of utility extensions and land use. The <br />study will complete an analysis of road design and cost allocation with public engagement with <br />property owners. The goals is to have the study start this spring with priority given to road design <br />and utility extension. <br />The developer would need to dedicate right-of-way along 165th Street for the improvement of the <br />road. <br />A collector road is designed to move traffic to access local roads. A number of proposed lots are <br />proposed to have direct access to 165th Street, which would not be allowed due to its minor <br />collector road status and the plan should be revised to relocate or remove them. <br />The applicant is showing a long, straight road connecting the south and north portions of the <br />development. It’s in staff opinion that traffic calming measures should be taken into <br />consideration on the proposed long roadway. The goal of traffic calming is to reduce speeds, <br />reduce cut through traffic, and improve safety including non-motorized traffic. Although, the <br />applicant has designed the road with slight variations, the roadway will need to be further <br />analyzed in regard to creating turns within the roadway. <br />Utilities <br />Municipal sewer and water are available from the development to the south. <br />The Met Council sanitary sewer interceptor is along the entire length of the west property line <br />there is a 35 foot wide easement along that area that includes the interceptor pipe and powerlines. <br />There are 6 lots that are shown along the west property line on the north side of the plan. These <br />lots will have restrictions to what can be constructed in the back yard within the easement area, <br />such as fences and sheds. Staff recommends these lots be evaluated to be relocated or reconfigured. <br />There is a 25 feet wide easement along the south property line for a sanitary sewer pipe. The <br />easement will need to be included on the plans. <br />Parks / Trails <br />The developer is required to dedicate land, pay a fee, or a combination of land and fee. At this <br />time, the developer has not indicated how they propose to satisfy the park dedication requirement, <br />but it is assumed that they will pay the fee because they are not showing a land dedication. <br />The park dedication section of the City Code requires the applicant dedicate 10% of the <br />developable acres for park land with a density of up to 3.99 units per acre. The developer has <br />indicated that there are 30 acres of buildable land in the development. Therefore, the developer <br />would be required to dedicate 3 acres of park land. The current park dedication fee is $3,400 per <br />unit. If a fee is preferable, with 90 units, the park dedication fee would be $306,000. <br />According to the Parks, Trails, and Open Space Plan, the property is in neighborhood park service <br />area 3. There are no existing parks in the area besides the passive park land that was recently