My WebLink
|
Help
|
About
|
Sign Out
Home
2026.02.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.02.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 1:12:16 PM
Creation date
3/16/2026 1:07:06 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/2/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sketch Plan Submittal January 12, 2026 <br />Frenchman Village Page 3 of 6 <br /> <br /> <br /> <br /> <br /> <br />LANDSCAPING/BUFFERS <br /> <br />Trees will be planted per Hugo development requirements along with landscape nodes within the <br />project. To provide a buffer/screen from Frenchman Road a combination of berming, architectural <br />fence and landscaping will be provided along the single-family area and western multifamily area. <br />This feature will parallel the south R/W line of Frenchman Road. The applicant also envisions <br />significant opportunities for landscaping/natural features within the ponding and flood mitigation areas <br />of the project. <br /> <br />The Downtown area is not proposed to have significant screening from Frenchman Road or Highway <br />61. Commercial/Retail visibility is key for the viability of future businesses and the townhome <br />product in the Downtown area will have front door access to the proposed Frenchman Road trail. <br /> <br />UTILITIES <br /> <br />The development area is served by trunk sewer and water mains along the south side of Frenchman <br />Road. Additionally, lateral water main connections will be made at Oneka Parkway, Fenway Avenue <br />and Victor Path to complete water main looping in the area. It is the applicants’ understanding that <br />each utility has the capacity to serve development as proposed. <br /> <br />STORMWATER MANAGEMENT <br /> <br />Stormwater from the site will generally flow southwest across the site and be directed to stormwater <br />ponds south of the single-family site and western townhome site. Required stormwater ponds and flood <br />mitigation areas will be configured to provide as much amenity as possible for proposed building sites, <br />pathways, open space and park areas. <br /> <br />Stormwater volume reduction - As part of the Preliminary Plat design stormwater infiltration/filtration <br />will be considered as well as stormwater reuse. Stormwater reuse though irrigation can assist in the <br />overall stormwater treatment for the site. Lastly the applicant may request to purchase stormwater <br />infiltration credits from the City of Hugo infiltration credit bank for a portion of required stormwater <br />volume reduction. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.