My WebLink
|
Help
|
About
|
Sign Out
Home
2026.02.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.02.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 1:12:16 PM
Creation date
3/16/2026 1:07:06 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/2/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sketch Plan Submittal January 12, 2026 <br />Frenchman Village Page 4 of 6 <br /> <br /> <br /> <br /> <br /> <br /> <br />ARCHITECTURE <br /> <br />Included in the sketch plan submittal package are building elevations for the single-family homes <br />proposed in the central portion of the site. These new homes will have a wide variety of elevations, <br />mix of colors, and product types, to enhance the value of the site and set the theme for this new <br />neighborhood. The far western end of the site will feature back-to-back townhomes west of the Oneka <br />Parkway Commercial Node that will soften the transition to the existing residential development to the <br />west and invite walkability to the new Commercial areas. The eastern village site will combine a <br />brownstone variety townhome opposite the main Commercial Center, abutting and visible from <br />Highway 61, at the SE corner of Frenchman Road. A fully integrated Trail System will permeate the <br />site and provide walkable access to all of the commercial buildings and a new 4-acre Park area near the <br />southeastern portion of Frenchman Village. We are very excited to offer the variety of homes, <br />amenities, and commercial conveniences as part of a new Downtown Hugo neighborhood at <br />Frenchman Village. <br /> <br />SITE ANOMOLIES <br /> <br />24” SEWER FORCE MAIN <br /> <br />A Metropolitan Council Environmental Services (MCES) force main extends across the single-family <br />area from an existing sanitary sewer lift station at the SE corner of Frenchman Road and Oneka <br />Parkway. The force main extends south along Oneka Parkway, thence southeast through the center of <br />the single-family area to a discharge point at the north terminus of Fenway Avenue. The current <br />alignment of this force main makes it impossible to attain density requirements in the single-family <br />area and overall development site. The applicant is proposing to relocate the force main around the <br />west and south side of the single-family area. The proposed relocation will be made at extreme <br />expense, but it is necessary to make the development viable. The applicant has met with MCES staff <br />and has been given a green light for the proposed forcemain relocation pending review, permitting and <br />contractual obligations. <br /> <br />FEMA FLOOD ZONE <br /> <br />Significant portions of the development currently lie within a 100-year FEMA floodplain. The <br />applicant is presently working with FEMA to refine the existing 100-year floodplain elevation and <br />subsequent floodway/ floodplain locations. As part of the proposed PUD application the applicant <br />will propose a site grading plan that will cut and fill as necessary to raise the building sites out of the <br />flood plain while providing compensatory flood storage for lost flood plain. This will require a Letter <br />of Map Revision (LOMR) to be approved by FEMA as the project proceeds. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.